Call Us 24/7
+91-8328868835
send mail us
info@lkengineers.in
Saptasati Vihar GGP Colony
Plot No- 2964, 2nd Floor Bhubaneswar

Koraput Medical College & Hospital

Clients

Government of Odisha

Work Done

HVAC & Ducting

Location

Koraput, Odisha

Budget

₹3 Crores

About Project

LK Engineers was entrusted with the design, installation, and commissioning of the complete HVAC and MGPS systems for Koraput Medical College & Hospital, one of the largest healthcare facilities in southern Odisha. The scope of work covered ICUs, operation theatres, wards, outpatient departments, and critical care areas, ensuring patient safety, comfort, and operational efficiency across the hospital.

Our Client’s Challenge

At Koraput Medical College & Hospital, the key challenges included providing a safe and hygienic indoor environment for patients, doctors, and staff through advanced HVAC and MGPS systems, while also ensuring uninterrupted operation in critical areas such as ICUs, OTs, and emergency wards. The project required seamless coordination of HVAC with medical gas pipelines, firefighting, and electrical systems within a complex hospital infrastructure, along with timely delivery under strict healthcare compliance and safety standards.

Time-Bound Delivery – Meeting the urgent deadline to make the hospital operational for public use.
Remote Location Logistics – Ensuring steady material supply and skilled manpower in Koraput.
Critical Area Sterility – Maintaining strict air quality standards while construction activities continued.
Complex Infrastructure – Navigating ducting and pipelines within limited ceiling and shaft spaces.

Our Approach And Solution

We approached this project with a healthcare-first mindset, knowing that lives depend on precision and reliability. Our team:

Implemented dedicated air handling units (AHUs) for critical zones to maintain sterile conditions.

Installed redundant systems to ensure uninterrupted air supply and medical gases, even in case of power or equipment failures.

Adopted modular project planning for smooth coordination with other contractors and faster execution.

Used international-grade materials and testing protocols to meet NABH and hospital safety norms.

What Customers Say?

The hospital management praised LK Engineers for delivering a reliable, energy-efficient, and hygienic HVAC & MGPS system. They appreciated the team’s ability to handle the project’s complexity and complete it on time, ensuring the hospital could start serving patients without delays.

Healthcare projects like Koraput Medical College & Hospital remind us why our work matters. Every duct, every pipe, and every system we install has a direct impact on saving lives. At LK Engineers, we are proud to deliver not just engineering solutions, but systems that safeguard health and wellbeing.

Mr. Dinesh Acharya
Founder & Chief Operations Officer
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare